We install generator outputs, main distribution systems, power panels, busbar connections and power transmission components in accordance with construction drawings and technical requirements.
Electrical Installation and Commissioning
Located in Aydın, Feslek Hydroelectric Power Plant is a renewable energy facility with a total installed capacity of 8.84 MW, comprising two generation units with a capacity of 4.42 MW each.
The electrical installation and commissioning works performed by KTM Group encompass the technical activities required to bring the power plant safely into operation, from generator connections, power and control panels, and cabling infrastructure to protection, automation, testing and energisation processes.
Scope of Services
We install Feslek Hydroelectric Power Plant’s generation, protection, control and power transmission systems in accordance with project requirements and support the facility’s transition to reliable operation through on-site inspections and commissioning tests.
We install generator outputs, main distribution systems, power panels, busbar connections and power transmission components in accordance with construction drawings and technical requirements.
We install power, control, measurement and communication cables, along with cable trays, conduits and routing systems, with due consideration for operational safety, maintenance access and facility organisation.
We perform connection and functional checks on the protection relays, control circuits, measurement systems and alarm infrastructure required for the generation units and electrical equipment.
We integrate automation, data acquisition, field instrumentation and communication systems to enable the centralised monitoring and control of power plant equipment.
We inspect grounding, equipotential bonding, lightning protection and auxiliary electrical systems in accordance with technical criteria supporting personnel, equipment and facility safety.
We prepare systems for operation through installation inspections, insulation and continuity measurements, protection function tests, signal verification and energisation procedures.
Commissioning Approach
The safe commissioning of a hydroelectric power plant depends not only on the installation of electrical equipment, but also on the integrated testing of all power, protection, control and automation systems.
At Feslek Hydroelectric Power Plant, KTM Group performs the commissioning process through controlled stages, from installation completion checks and functional testing to unit-level verification and integrated system operation. This approach supports the identification of potential non-conformities before energisation and the reliable commissioning of the power plant.