Menu

Karura Thermal Hotel Facility Construction Project

Ongoing Projects

Karura Thermal Hotel Facility Construction Project

Project details for the planned Karura Thermal Hotel, comprising two blocks, 146 rooms and 300 beds on a 14,218 m² site.

Contact Us

Thermal Tourism Investment

Bringing thermal tourism together with a contemporary hospitality experience.

The Karura Thermal Hotel Construction Project is a comprehensive thermal tourism investment planned across a total area of 14,218 m², comprising two blocks with a capacity of 146 rooms and 300 beds.

The project encompasses accommodation units, thermal facilities, communal areas, technical spaces and support services within an integrated facility layout. Architectural functionality, guest comfort, structural safety, energy efficiency and long-term operational requirements constitute the core components of the project approach.

Project Scope

Facility planning that integrates accommodation and thermal tourism functions

Karura Thermal Hotel has been planned in accordance with architectural, structural and technical solutions that ensure the harmonious operation of its various functional areas.

Two-Block Layout

The facility is designed with a two-block architectural layout that enables the organised distribution of accommodation and communal functions.

Accommodation Units

Planned with a total capacity of 146 rooms and 300 beds, the accommodation units are arranged with due consideration for guest comfort, functional circulation and the efficient delivery of service operations.

Thermal Facilities

Areas designated for the use of the thermal resource are planned with hygienic, safe and comfortable spatial solutions that support health, relaxation and rejuvenation.

Communal Areas

Reception, relaxation, food and beverage, and social areas are considered within an integrated spatial organisation that enhances the guest experience throughout the facility.

Technical Infrastructure and Systems

Mechanical, electrical, plumbing, HVAC, fire safety and automation systems are designed in accordance with the facility’s capacity and uninterrupted operational requirements.

Environmental and Landscape Design

The relationship between the buildings and their surroundings is evaluated together with outdoor uses, pedestrian circulation, access arrangements and landscaping decisions to create a high-quality facility environment.

14,218 m² total area planned for the project
2 Blocks architectural layout of the facility
146 Rooms planned accommodation capacity
300 Beds total bed capacity of the facility

Integrated Approach

Functional and sustainable building solutions for a thermal hotel investment

The success of a high-quality thermal hotel investment depends on the integration of architectural design, thermal systems, accommodation comfort, technical infrastructure and operational requirements within a unified project approach.

In the Karura Thermal Hotel project, the functional relationships between the facility’s various areas are addressed together with the technical criteria required for construction and operation. This approach supports the development of the investment as a safe, efficient and long-lasting facility.

  • Functional layout planning of the 14,218 m² project area
  • Establishing circulation and functional connections between the two blocks
  • Designing 146 rooms in accordance with comfort and operational requirements
  • Planning service areas appropriate for a capacity of 300 beds
  • Designing thermal facilities and associated installation systems
  • Integration of mechanical, electrical and plumbing infrastructure
  • Consideration of fire safety and accessibility requirements
  • Development of energy-efficient and sustainable operational solutions
  • Planning of landscaping, transportation and outdoor areas