Electrical Installation and Commissioning for Yıldızlı Hydropower Plant

Completed Projects

Electrical Installation and Commissioning for Yıldızlı Hydropower Plant

Technical scope of electrical system installation and commissioning services for the 3 × 3.34 MW Yıldızlı Hydroelectric Power Plant in Trabzon.

Contact Us

Electrical Installation and Commissioning

Preparing Yıldızlı Hydroelectric Power Plant’s electrical infrastructure for safe and efficient generation.

Located in Trabzon, Yıldızlı Hydroelectric Power Plant is a renewable energy facility with a total installed capacity of 10.02 MW, comprising three generation units with a capacity of 3.34 MW each.

The electrical installation and commissioning works performed by KTM Group encompass the technical activities required to bring the power plant reliably into operation, from generator connections and power distribution systems to cabling and automation infrastructure, protection testing, synchronisation and energisation procedures.

Scope of Services

Integrated electrical systems across three generation units

We install Yıldızlı Hydroelectric Power Plant’s power, protection, control, measurement and automation systems in accordance with construction drawings and support the facility’s controlled transition to generation through on-site inspections and commissioning tests.

Generator and Power Connections

We install the generator outputs, main power cables, busbars and power transmission connections of the three 3.34 MW generation units in accordance with the technical designs.

Distribution Panels and Auxiliary Systems

We perform installation and connection checks for medium- and low-voltage panels, motor control centres, direct- and alternating-current auxiliary power supplies, and field distribution systems.

Cabling and Cable Management Infrastructure

We install power, control, measurement and communication cables, along with cable trays, conduits and routing systems, with due consideration for safety, maintenance access and facility organisation.

Protection, Measurement and Control Systems

We complete the connections for the protection relays, measurement circuits, interlocks, alarm systems and control functions required for the generation units and electrical equipment.

Automation and Monitoring Systems

We integrate field instrumentation, data acquisition, communication and automation systems to enable the centralised monitoring and control of power plant equipment.

Testing, Synchronisation and Commissioning

We prepare the systems for safe operation through electrical measurements, protection and functional tests, signal verification, unit synchronisation and energisation activities.

10.02 MW total installed capacity of Yıldızlı Hydroelectric Power Plant
3 generation units whose electrical systems were commissioned
3.34 MW capacity of each generation unit at the power plant
Trabzon project and implementation region where Yıldızlı Hydroelectric Power Plant is located

Commissioning Approach

A controlled and verifiable transition to operation for electrical systems

Safely commissioning a hydroelectric power plant comprising three generation units requires the electrical systems of each unit to be verified individually and the integrated operation of all facility components to be tested.

At Yıldızlı Hydroelectric Power Plant, KTM Group manages the commissioning process through controlled stages, from installation completion checks and unit-specific functional tests to synchronisation activities and integrated facility trials. This approach supports the identification of potential technical non-conformities before generation begins and the reliable commissioning of the power plant.

  • Verifying compliance between electrical designs and on-site installations
  • Completing generator, panel, busbar and power connections
  • Installing power, control, measurement and communication cables
  • Testing protection relays, interlocks and alarm functions
  • Verifying automation, instrumentation and field signals
  • Performing unit synchronisation and grid connection checks
  • Energisation, load testing and integrated commissioning activities