Adana Ceyhan Hydroelectric Power Plant Project

Completed Projects

Adana Ceyhan Hydroelectric Power Plant Project

Information on the energy investment and technical scope of the hydroelectric power plant project developed in Ceyhan, Adana.

Contact Us

Hydroelectric Energy Project

Harnessing Ceyhan’s water resources through renewable energy investment.

The Adana Ceyhan Hydroelectric Power Plant Project is a renewable energy investment developed to harness the water resources of Ceyhan for hydroelectric power generation.

The project addresses the hydrological characteristics of the water resource, site conditions, energy structures, electromechanical systems and grid connection through an integrated approach. Technical feasibility, environmental responsibility and long-term operational efficiency constitute the core components of the investment approach.

Project Scope

Integrated engineering for hydroelectric power generation

The Ceyhan Hydroelectric Power Plant Project is being developed through complementary technical studies spanning resource measurement, energy generation system planning, environmental assessments and grid connection.

Hydrological Studies

River flow rates, seasonal flow variations, catchment characteristics and long-term water data are examined to assess the resource potential available for power generation.

Site and Ground Investigations

The project site’s topographical, geological and geotechnical characteristics are investigated to generate the technical data required for the safe positioning of energy structures.

Water Intake and Conveyance Structures

The systems required for the controlled intake and conveyance of water to the power plant are planned in accordance with flow rate, hydraulic head, terrain conditions and operational requirements.

Power Plant and Electromechanical Systems

Technical options for the power plant structure and its turbine, generator, control and automation systems are evaluated in accordance with the projected generation conditions.

Power Transmission and Grid Connection

The connection point, power transmission infrastructure, protection and control requirements are addressed to ensure the reliable transfer of the electricity to be generated to the grid.

Environmental and Technical Assessment

The project’s potential impacts on water resources, the natural environment and regional land-use conditions are examined to determine protective measures and sustainable implementation principles.

Adana province where the hydroelectric energy investment is being developed
Ceyhan district where the project activities are being conducted
HEPP renewable energy investment based on hydropower
1 integrated hydroelectric power plant project

Project Approach

End-to-end planning from water resource to grid connection

The success of hydroelectric energy investments depends on accurately measuring the resource, developing engineering solutions suited to site conditions and incorporating environmental impacts into project decisions.

KTM Group evaluates the Adana Ceyhan Hydroelectric Power Plant Project from multiple perspectives, including hydrological potential, power generation systems, structural safety, grid connection and operational requirements. This approach supports the early identification of technical risks and ensures that investment decisions are based on reliable data.

  • Reviewing catchment characteristics and existing water data
  • Measuring river flow rates and seasonal flow variations
  • Conducting topographical, geological and geotechnical site investigations
  • Preparing technical and economic feasibility studies
  • Designing water intake and conveyance structures
  • Evaluating turbines, generators and auxiliary systems
  • Developing power plant layouts and structural solutions
  • Determining power transmission and grid connection requirements
  • Assessing environmental impacts and protective measures